Auth required
Checked 6d ago
Gridbert
at.gridbert/mcp
Austrian energy data: 119 electricity tariffs daily, grid fees, subsidies, bill analysis.
Latest observation
Status overview
Reliability
Auth-required and unknown checks are excluded.Uptime and latency
OperationalDegradedDownExcludedNewest on the left
Transparent checks
What was tested
Network reachability
PassedHTTPS endpoint and response timing.
MCP handshake
FailedModern discovery or legacy initialization.
Tools/list
FailedCapability discovery without invoking any tool.
Events
Recent incidents
No incidents recorded
An incident opens only after consecutive confirmed failures.
Keep exploring
Browse directory →