Operational
Checked 1d ago
The Power Contractor — Genuine OEM Industrial Parts & Iraq/MENA Sourcing
com.pc-cn/industrial-sourcing
Genuine OEM power plant & industrial parts search, <150ms BOM validation, Iraq/MENA B2B RFQ.
Latest observation
Status overview
Reliability
Auth-required and unknown checks are excluded.Uptime and latency
OperationalDegradedDownExcludedNewest on the left
Transparent checks
What was tested
Network reachability
PassedHTTPS endpoint and response timing.
MCP handshake
PassedModern discovery or legacy initialization.
Tools/list
PassedCapability discovery without invoking any tool.
Events
Recent incidents
No incidents recorded
An incident opens only after consecutive confirmed failures.
Keep exploring
Browse directory →