Operational Checked 1d ago

The Power Contractor — Genuine OEM Industrial Parts & Iraq/MENA Sourcing

com.pc-cn/industrial-sourcing

Official site ↗

Genuine OEM power plant & industrial parts search, <150ms BOM validation, Iraq/MENA B2B RFQ.

Latest observation

Status overview

Current statusOperationalNetwork, MCP handshake, and supported capability checks succeeded.
Latency105 msEnd-to-end protocol check
Protocol2025-11-25Legacy flow
Tools discovered5Safe tools/list discovery only
Reliability

Uptime and latency

Auth-required and unknown checks are excluded.
Last 24 hours—Collecting comparable data
Last 7 days100%1 comparable checks · 105 ms average
Last 30 days100%2 comparable checks · 107 ms average
OperationalDegradedDownExcludedNewest on the left
Transparent checks

What was tested

Network reachability

HTTPS endpoint and response timing.

Passed
MCP handshake

Modern discovery or legacy initialization.

Passed
Tools/list

Capability discovery without invoking any tool.

Passed
Events

Recent incidents

No incidents recorded

An incident opens only after consecutive confirmed failures.

Keep exploring
Browse directory →