Operational
Checked 10d ago
Portravo Construction Takeoff
com.portravo/construction-takeoff
Review construction plan takeoffs and download reviewed estimates with Portravo account linking.
Latest observation
Status overview
Reliability
Auth-required and unknown checks are excluded.Uptime and latency
OperationalDegradedDownExcludedNewest on the left
Transparent checks
What was tested
Network reachability
PassedHTTPS endpoint and response timing.
MCP handshake
PassedModern discovery or legacy initialization.
Tools/list
PassedCapability discovery without invoking any tool.
Events
Recent incidents
No incidents recorded
An incident opens only after consecutive confirmed failures.
Keep exploring
Browse directory →