Operational Checked 14h ago

Costable — Parametric Should-Cost Analysis

io.github.1337mofo/costable

Parametric should-cost: P50/P80/P90 estimates, 801 materials, 25 countries, quote review.

Latest observation

Status overview

Current statusOperationalNetwork, MCP handshake, and supported capability checks succeeded.
Latency3047 msEnd-to-end protocol check
Protocol2024-11-05Legacy flow
Tools discovered10Safe tools/list discovery only
Reliability

Uptime and latency

Auth-required and unknown checks are excluded.
Last 24 hours100%1 comparable checks · 3047 ms average
Last 7 days100%1 comparable checks · 3047 ms average
Last 30 days100%1 comparable checks · 3047 ms average
OperationalDegradedDownExcludedNewest on the left
Transparent checks

What was tested

Network reachability

HTTPS endpoint and response timing.

Passed
MCP handshake

Modern discovery or legacy initialization.

Passed
Tools/list

Capability discovery without invoking any tool.

Passed
Events

Recent incidents

No incidents recorded

An incident opens only after consecutive confirmed failures.

Keep exploring
Browse directory →