Operational Checked 5d ago

Elétrico Leve

io.github.canalthailexa-lgtm/eletricoleve

Brazilian light EVs (e-bikes, scooters, tricycles): specs, prices and Contran 996/2023 status.

Latest observation

Status overview

Current statusOperationalNetwork, MCP handshake, and supported capability checks succeeded.
Latency118 msEnd-to-end protocol check
Protocol2025-11-25Legacy flow
Tools discovered5Safe tools/list discovery only
Reliability

Uptime and latency

Auth-required and unknown checks are excluded.
Last 24 hours—Collecting comparable data
Last 7 days100%1 comparable checks · 118 ms average
Last 30 days100%4 comparable checks · 136 ms average
OperationalDegradedDownExcludedNewest on the left
Transparent checks

What was tested

Network reachability

HTTPS endpoint and response timing.

Passed
MCP handshake

Modern discovery or legacy initialization.

Passed
Tools/list

Capability discovery without invoking any tool.

Passed
Events

Recent incidents

No incidents recorded

An incident opens only after consecutive confirmed failures.

Keep exploring
Browse directory →